We got the footers poured today, all 8 of them. I am so glad I decided to rent the cement mixer as we were able to mix 6 bags of concrete at once. I would still be out there mixing concrete if we didn't have the mixer.
We used 42 bags of concrete. At 60 lbs. per bag, that's 2520 lbs.!!! I figured that I moved each bag 4 times.
- At the store, from the ground to the van.
- At home, from the van to garage (didn't want to run the risk of it getting wet!)
- From the garage to the backyard.
- From the ground up into the cement mixer.
That means I moved over 5 tons of concrete...all by myself. OK...that's 60 lbs. at a time, and over several days, but still,
I moved over 5 tons of concrete all by myself!! And since my wife was the one who shoveled the concrete into the holes, she moved over a ton of concete by herself. So, combined,
my wife and I moved over 6 tons of concrete in 2 days, using nothing but our hands. The next scheduled day of construction is this Friday, when my father, uncle and father in-law will start framing the deck.